Teaching Takt-Time, Flowline, and Point-to-point Precedence Relations: A Peruvian Case Study
Teaching Takt-Time, Flowline, and Point-to-point Precedence Relations: A Peruvian Case Study
No hay miniatura disponible
Fecha
2017
Autores
Brioso X.
Murguia D.
Urbina A.
Título de la revista
Revista ISSN
Título del volumen
Editor
Elsevier Ltd
Proyectos de investigación
Unidades organizativas
Número de la revista
Abstracto
Over the last few years, Point-to-Point Precedence Relations (PTPPR) has emerged as a significant theme in the construction industry, indicating that point-to-point relations are better than Critical Path Method (CPM), both theoretically and practically. As the same time, research has focused on takt-time and flowlines. Both methods have been compared and integrated. This article presents strategies for teaching the integration of these popular methods in construction-management courses to undergraduate students of civil engineering at the Pontifical Catholic University of Peru. The case study is a community-house project that has highly repetitive processes in the structural works phase. First, we used traditional tools such as Excel spreadsheets and 2D drawings to teach production-system design with takt-time, flowlines, and PTPPR. Second, we used 3D and 4D models with Revit and Navisworks to integrate the previous takt-time schedule with a BIM model and identify its strengths and weaknesses. Finally, we used Vico Office for the automation of schedules and comparison of the methods in 4D and 5D. The article describes the lectures, workshops, and simulations employed, as well as feedback from students and instructors. The success of this teaching strategy is reflected in the survey responses from students and the opportunities for improvement identified.
Descripción
This work was partially funded by the Dirección de Gestión de la Investigación at the PUCP, and the Consejo Nacional de Ciencia, Tecnología e Innovación Tecnológica del Perú (CONCYTEC from its acronym in Spanish), according to the Convenio de Gestión N° 232-2015-FONDECYT. We would also like to thank to Dilmer Dueñas, who kindly participated as instructor in the workshops.
Palabras clave
Undergraduate students,
Architectural design,
Construction industry,
Education,
Flowlines,
Project management,
Spreadsheets,
Students,
Turnaround time,
Construction Management Courses,
Critical path method,
Point-to-point relations,
Precedence relations,
Repetitive process,
TAKT time,
Teaching